Nevada Revised Statutes (Last Updated: December 24, 2014) |
TITLE46 MINES AND MINERALS |
CHAPTER517. Mining Claims, Mill Sites and Tunnel Rights |
LOCATION OF MINING CLAIMS, MILL SITES AND TUNNEL RIGHTS |
Tunnel Rights |
NRS517.150. Requirements for location.
Latest version.
- The locator of a tunnel right or location shall locate his or her tunnel right or location by posting a notice of location at the face or point of commencement of the tunnel, which notice must contain:
1. The name of the locator and the locator’s mailing address.
2. The date of the location.
3. The proposed course or direction of the tunnel.
4. The height and width thereof.
5. The position and character of the boundary monuments.
6. A description of the tunnel by reference to a natural landmark or a readily identifiable artificial landmark which identifies the claim or tunnel right.
[19:89:1897; C § 226; RL § 2440; NCL § 4138]—(NRS A 1971, 2202; 1985, 1500)