NRS408.319. Report of projects for construction and maintenance: Preparation; contents; revision; public inspection.  


Latest version.
  •       1.  The Department shall prepare and make available for public inspection a report of its projects for the construction and maintenance of highways. The report must include:

          (a) A description of the Department’s work in progress and its proposed projects;

          (b) The cost of each project, including the anticipated cost for:

                 (1) The acquisition of rights-of-way;

                 (2) Design and engineering; and

                 (3) Construction; and

          (c) The estimated starting dates for each project and the components of each project.

          2.  The report must be revised every 6 months to indicate any change in the cost of a project or the component of a project, and any change in the starting or completion date of a project.

          3.  The Department shall make the report available for public inspection at its office during normal business hours.

      (Added to NRS by 1991, 1904)