NRS271.641. Engineer’s report: Preparation and filing; contents.  


Latest version.
  •   Whenever the governing body determines that a modification authorized pursuant to NRS 271.6405 is warranted, the engineer shall prepare and file with the clerk a report showing:

          1.  The proposed modification of the project;

          2.  If the modified portion of the project is, as modified, functionally equivalent to that portion of the project before modification, a statement to that effect;

          3.  The estimated cost of the project, as modified;

          4.  The amount of maximum special benefits estimated to be derived from the project, as modified, by each tract in the improvement district;

          5.  The modification, if any, of the assessment on each tract in the improvement district resulting from the modification of the project;

          6.  The modification, if any, of the assessment installments and the due dates of the assessment installments;

          7.  A revised map showing the location of the project, as modified;

          8.  If the assessments on each tract in the improvement district are proposed to be modified, an assessment plat with the modified assessments, apportioned based on the project, as modified; and

          9.  Whether, upon modification of the project the assessment on each tract in the improvement district will exceed the estimated maximum special benefits to be derived by each such tract from the project.

      (Added to NRS by 2011, 2907)